Problem 6-16 (Algo) The desired daily output for an assembly line is 420 units. This assembly line w

Need your ASSIGNMENT done? Use our paper writing service to score better and meet your deadlines.


Order a Similar Paper Order a Different Paper

Problem 6-16 (Algo)

The desired daily output for an assembly line is 420 units. This assembly line will operate 595 minutes per day. The following table contains information on this product's task times and precedence relationships:

TASKTASK TIME
(SECONDS)
IMMEDIATE
PREDECESSOR
A35
B40A
C70B
D10B
E40A
F30D-C
G20E
H15G-F

b. What is the required workstation cycle time to meet the desired output rate?

c. Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. (Leave no cells blank – be certain to enter “0” wherever required.)

d. What is the efficiency of your line balance, assuming it is running at the cycle time in part b? (Round your answer to 1 decimal place.)

W Shudent Hame -GaWM.I Ch 6 W 10/9 x anewconnectmheducation.com/low/conmecthtm Ch 6 W 109 Save& Exit Stund Help Submit 1 ProbW Shudent Hame -GolWMJ Ch6 w 10/0 x newconnectmheducation.com/flow/conmecthim Ch 6 W 109 Save&Exit Snd Help Submit 1 G-l 15 b

W Shudent Hame -GaWM.I Ch 6 W 10/9 x anewconnectmheducation.com/low/conmecthtm Ch 6 W 109 Save& Exit Stund Help Submit 1 Problem 6-16 (Algo) The desired daily output for an assembly line is 420 units This assembly line will operate 595 minutes per day The fallowing table contains information on this product's task times and precedence relationships 30 TASK TIME IHMEDIATE (SECONDS) ponts TASK PREDECESSOR 35 Skipped 40 70 1A 40 D-C 20 E nons H. 15 G-F b. What is the required workstation cycle time to meet the desired output rate Beference SAOnds per unt Worksteion cycle time c. Balace this Ire using the largest number of fallowing tasks. Use the longest task tirme as a secondary criterion. (Leave no cells blenk be certain to enter “o” wherever required.) Idle Time Work Station Task Mc Graw Hil PIcy 1 of 1 Next T:03 PM Plype here to search Ei W Shudent Hame -GolWMJ Ch6 w 10/0 x newconnectmheducation.com/flow/conmecthim Ch 6 W 109 Save&Exit Snd Help Submit 1 G-l 15 b. What is the required workstation cycle time to meet the desired output rate? SAOnds per unt Workstelian cycle time 30 Skped c. Balance this Irre using the largest number of fallowing tasks. Usse the longest task time as a secondary criterion. (Leave no cells blank be certain to enter “O wherever required.) onic Work Statinn Idle Time Task References II d. What is the efficiency of your line balance, assuming it is running at the cycle time in part b? (Round your answer to 1 decimel place.) Elficiency 1 of 1 Prcy Next Ad1-03 PM 10/3/2019 ype here to search

"Is this question part of your assignment? We can help"

ORDER NOW

Do you need help with this or a different assignment? We offer CONFIDENTIAL, ORIGINAL (Turnitin/LopesWrite/SafeAssign checks), and PRIVATE services using latest (within 5 years) peer-reviewed articles. Kindly click on ORDER NOW to receive an A++ paper from our masters- and PhD writers.

Get a 15% discount on your order using the following coupon code SAVE15


Order a Similar Paper Order a Different Paper